Construction Process for Building
Your NEW
Swimming Pool and Spa
Starts
with selection of the shape and size of your pool and spa:
tile selection, coping, pavers, finish, and cleaning system.
Note: The contractor is always present for the lay out and
excavation of the pool. This is to assure accuracy and protection
of your property and your neighbors.
STEP
1:
Lay
out your pool and spa.
STEP
2:
Excavation:
We start by digging out the area for the shape and size
of the pool and spa.
STEP
3:
Forming: We
form the walls and floor with steel rebar grid to the
shape of your pool and spa shell. At the same time we
are setting the pipes for the filter, cleaning system,
and pump.
STEP
4:
Concrete: We
pour the walls and floor with concrete to the shape of
the pool and spa. The shell is now complete.
STEP
5:
Plumbing: Pipe
is plumbed from pool and spa to equipment location.
STEP
6:
Coping & Tile:
Your selection of tile and coping is then installed on
the pool and spa shell.
STEP
7:
Decking: The
deck is then installed. It may be concrete or pavers.
STEP
8:
Plaster: After
cleaning the shell, your interior finish is then applied.
The finish is usually quartz or pebble.
STEP
9:
Start Up: Your
pool and spa is then filled with water, ready for you
to enjoy.